Apex Peakway Southwest Connector

Project #5

View on Interactive Map →

This project completes a gap in the Apex Peakway by spanning South Salem Street and the CSX S-Line with a four-lane bridge to connect the existing sections of the Peakway. The existing intersection at South Salem Street will be relocated to a new a four-lane loop road connector. Sidewalk will connect along the Peakway on both sides of the bridge, both sides of the new loop road, and along the north side of South Salem Street. Town Council has identified this project as one of its highest priorities but the costs and lack of outside funding have made beginning construction difficult. Funds from a 2015 bond referendum along with some Locally Administered Projects Program (LAPP) funding cover approximately $10.50 million of project costs. The proposed bond referendum would provide the remaining $15.0 million needed to fund the project.

Project Details

Status
Construction
Priority
Medium
Funding Source
Designated Capital Funds, General Obligation Bonds
Coordinates
35.72076836, -78.86501312
Start Date
January 2017
Construction Start
October 2024
Estimated Completion
October 2026
More Info
https://www.apexnc.org/1842/Apex-Peakway-SW-Connector

Funding Schedule

Fiscal YearAmount
FY 2026$0
FY 2027$0
FY 2028$0
FY 2029$0
FY 2030$0
Future$0
Total Cost$21,256,132