Transportation

Annual Pavement Management

Project #619

View on Interactive Map →

The Town is responsible for maintaining 240 miles of municipal streets with an annual resurfacing contract providing for most pavement maintenance needs. Street mileage is growing annually with ongoing development. A recent survey of our streets revealed that deferred maintenance needs to be addressed. This ongoing program focuses on deficiencies in pavement conditions throughout Apex and addresses issues, such as potholes, alligator cracking, and rutting, to provide a safe and reliable transportation system. This program also includes lower cost pavement preservation tools to extend pavement life cycle and reduce long term resurfacing costs while ensuring curb ramps on all resurfacing projects comply with state and federal mandates. Powell Bill funding is allocated from the State for road maintenance, but current and future resurfacing costs continue to exceed Powell Bill allocations, requiring General Fund revenues to be allocated.

Project Details

Status
Ongoing
Priority
Medium
Funding Source
Intergovernmental Funds (Powell Bill Revenues), Designated Capital Funds
Start Date
July 2024
Construction Start
*
Estimated Completion
June 2029

Funding Schedule

Fiscal YearAmount
FY 2026$3,750,000
FY 2027$3,875,000
FY 2028$4,000,000
FY 2029$4,125,000
FY 2030$4,250,000
Future$4,375,000
Total Cost$24,375,000