This project completes sidewalk gaps in front of the Beaver Creek Commons shopping center, crossing the US 64 eastbound off ramp, connecting across the bridge over US 64, and extending to the Vision Drive intersection. Signalized crosswalks would be installed at the existing traffic signals on both ends of this project. This project allows pedestrians to no longer travel along the road’s shoulder and addresses inaccessible ramps and crosswalks at both ends of this project.

Project Details

Status
Planning
Priority
Medium
Funding Source
General Obligation Bonds, General Fund / Capital Outlay
Coordinates
35.74790547, -78.87488365
Start Date
July 2024
Estimated Completion
June 2026

Funding Schedule

Fiscal YearAmount
FY 2026$0
FY 2027$1,600,000
FY 2028$0
FY 2029$0
FY 2030$0
Future$0
Total Cost$1,600,000