Transportation

Davis Drive at Salem Church Road Realignment

Project #637

View on Interactive Map →

This project realigns 1000' of Davis Drive north of Jenks Road to improve the horizontal curvature and widens that section of road to 4-lane divided. This project also widens Salem Church Road across the CSX tracks to a 3-lane section and installs new gates and lights. This intersection would have a traffic signal and railroad gate arms installed, and this intersection would shift west, away from the CSX railroad freight line, allowing vehicles to stack beyond the tracks. This project alleviates Salem Church Road needing to convert to right in-right out and alleviates safety concerns for the following issues: no left turn on Davis Drive backing up traffic southbound, no space for a traffic signal or gate arms to warn of an approaching train, and limited visibility around the curve on Davis Drive.

Project Details

Status
Not Started
Priority
Medium
Funding Source
General Fund / Capital Outlay, General Obligation Bonds
Coordinates
35.75452723, -78.84654343
Start Date
July 2026
Estimated Completion
June 2028

Funding Schedule

Fiscal YearAmount
FY 2026$0
FY 2027$0
FY 2028$0
FY 2029$0
FY 2030$0
Future$7,300,000
Total Cost$7,300,000

Location

Open in cipmap →