Parks, Recreation & Cultural Resources

Reedy Branch Greenway

Project #651

View on Interactive Map →

This project completes a greenway gap between the American Tobacco Trail and Kelly Road by extending the 10' asphalt Reedy Branch Greenway from Kelly Road to Goliath Lane. From the existing greenway at Goliath Lane, the proposed greenway runs east along the north side of Reedy Branch before crossing to the south side of the creek and continuing east to Kelly Road. A mid-block crossing proposed at Kelly Road would connect to the existing side path on the east side of the road. Neighborhood connections are proposed at Rothwood Way, Homestead Park Drive, Evening Star Drive, and Windy Creek Lane. This project provides connectivity to transit stops, Abbington, Stratford at Abbington, Sweetwater, Homestead Park, Creekside, and other connected subdivisions, schools, commercial spaces, and office spaces.

Project Details

Status
Design
Priority
Medium
Funding Source
General Fund / Capital Outlay, Designated Capital Funds
Coordinates
35.73820475, -78.90440941
Start Date
July 2024
Estimated Completion
June 2028

Funding Schedule

Fiscal YearAmount
FY 2026$0
FY 2027$0
FY 2028$0
FY 2029$0
FY 2030$0
Future$6,555,000
Total Cost$6,555,000

Location

Open in cipmap →