Reedy Branch Greenway
Project #651
View on Interactive Map →This project completes a greenway gap between the American Tobacco Trail and Kelly Road by extending the 10' asphalt Reedy Branch Greenway from Kelly Road to Goliath Lane. From the existing greenway at Goliath Lane, the proposed greenway runs east along the north side of Reedy Branch before crossing to the south side of the creek and continuing east to Kelly Road. A mid-block crossing proposed at Kelly Road would connect to the existing side path on the east side of the road. Neighborhood connections are proposed at Rothwood Way, Homestead Park Drive, Evening Star Drive, and Windy Creek Lane. This project provides connectivity to transit stops, Abbington, Stratford at Abbington, Sweetwater, Homestead Park, Creekside, and other connected subdivisions, schools, commercial spaces, and office spaces.
Project Details
- Status
- Design
- Priority
- Medium
- Funding Source
- General Fund / Capital Outlay, Designated Capital Funds
- Coordinates
- 35.73820475, -78.90440941
- Start Date
- July 2024
- Estimated Completion
- June 2028
Funding Schedule
| Fiscal Year | Amount |
|---|---|
| FY 2026 | $0 |
| FY 2027 | $0 |
| FY 2028 | $0 |
| FY 2029 | $0 |
| FY 2030 | $0 |
| Future | $6,555,000 |
| Total Cost | $6,555,000 |