Water & Sewer Utility

U-5301: US 64 Corridor Improvements Utility Relocation

Project #727

View on Interactive Map →

This project relocates existing water and sewer utilities to accommodate NCDOT’s US 64 corridor improvements between Laura Duncan Road and the Cary/Apex jurisdictional boundary. This project extends a water line down Laura Duncan Road, under US 64, and ties-in to the existing water line that runs parallel with US 64. Extending the water line across US 64 removes the need to flush multiple dead-end lines, which is currently needed to maintain proper disinfectant levels. This project also installs three stubbed water lines on Shepherd’s Vineyard Drive with approximately 800 linear feet of water main.

Project Details

Status
Not Started
Priority
Medium
Coordinates
35.74854982, -78.83477926
Start Date
July 2028
Estimated Completion
June 2029

Funding Schedule

Fiscal YearAmount
FY 2026$0
FY 2027$0
FY 2028$0
FY 2029$3,850,000
FY 2030$0
Future$0
Total Cost$3,850,000

Location

Open in cipmap →