U-5301: US 64 Corridor Improvements Utility Relocation
Project #727
View on Interactive Map →This project relocates existing water and sewer utilities to accommodate NCDOT’s US 64 corridor improvements between Laura Duncan Road and the Cary/Apex jurisdictional boundary. This project extends a water line down Laura Duncan Road, under US 64, and ties-in to the existing water line that runs parallel with US 64. Extending the water line across US 64 removes the need to flush multiple dead-end lines, which is currently needed to maintain proper disinfectant levels. This project also installs three stubbed water lines on Shepherd’s Vineyard Drive with approximately 800 linear feet of water main.
Project Details
- Status
- Not Started
- Priority
- Medium
- Coordinates
- 35.74854982, -78.83477926
- Start Date
- July 2028
- Estimated Completion
- June 2029
Funding Schedule
| Fiscal Year | Amount |
|---|---|
| FY 2026 | $0 |
| FY 2027 | $0 |
| FY 2028 | $0 |
| FY 2029 | $3,850,000 |
| FY 2030 | $0 |
| Future | $0 |
| Total Cost | $3,850,000 |