Capital Improvement Projects
147 projects across 8 categories. View on interactive map →
Electric Utility (11)
- East Williams Substation — Planning
- Green Level Substation — Planning
- System Expansion — Ongoing
- LED Replacement — Ongoing
- Load Management Switch Replacement — Planning
- Service Truck - Replacement — Not Started
- Veridea System Expansion — Planning
- Digger Derrick - Replacement — Not Started
- Mini Excavator — Not Started
- Bucket Truck - Replacement — Not Started
- CM Labs Advantage Simulator — Not Started
Parks, Recreation & Cultural Resources (21)
- Pleasant Park Baseball and Softball Complex — Design
- Apex Community Park Playground Renovations — Design
- Annual Greenway Maintenance and Development — Ongoing
- Beaver Creek Greenway Extension — Planning
- KidsTowne Playground Renovation — Design
- Middle Creek Greenway — Planning
- Reedy Branch Greenway — Design
- Wimberly Road Park Design — Not Started
- Community Park Trail Widening — Not Started
- Environmental Education Center — Design
- Hunter Street Park Renovation — Not Started
- Street Hockey & Inclusive Playground — Not Started
- Big Branch Greenway — Not Started
- Nature Park Operations & Maintenance Building — Not Started
- Jaycee Park Expansion — Not Started
- Apex Community Park Parking Lot Expansion — Not Started
- Olive Farm Park Design — Not Started
- Seymour Athletic Fields/Nature Park Parking Lot Expansion & Turf Renovation — Not Started
- Olive Farm Road House Upfit — Not Started
- Town Campus Stage — Not Started
- Beaver Creek Greenway Renovation — Not Started
Public Facilities (18)
- Tunstall House Restoration — Construction
- Fire Alarm Panel and Equipment Replacement — Construction
- Fire Department Administration Building — Design
- Fire Station 3 Renovation/Addition — Design
- Mechanical (HVAC/Chiller) Upgrades & Replacements — Ongoing
- Parking Lot and Internal Street Assessment & Long Maintenance Plan — Ongoing
- Town Wide Solar Initiative — Construction
- Depot Parking Lot Repurposing — Not Started
- Public Safety Station 7 — Not Started
- Fleet Fluid Pumps/Reclamation — Not Started
- Police Department Addition & Renovation — Not Started
- Public Safety Station 8 — Not Started
- Rebuild/Remodel Fire Station 2 — Not Started
- Hughes Street Mixed-Use Development — Not Started
- Town Hall Renovations — Not Started
- Electric Vehicle Supply Equipment Infrastructure Development — Not Started
- Town Facility Roof Replacement Project — Not Started
- Public Works Campus — Not Started
Public Safety (12)
- Engine (Pumper) - Replacement — Planning
- Radio Replacement — Planning
- Driving Simulator — Not Started
- Fire Pumper for Station 7 — Not Started
- Ladder (Aerial) - Replacement — Not Started
- Rescue Retrieval Van — Not Started
- Self-Contained Breathing Apparatus Replacement — Not Started
- Rescue - Replacement — Not Started
- Fire Pumper - Replacement — Not Started
- Fire Pumper for Station 8 — Not Started
- Special Response Team Van — Not Started
- Ladder (Aerial) - New — Not Started
Public Works and Environmental Services (15)
- Rear Loader - New — Planning
- CAT 920 Front-End Loader - Addition — Not Started
- Leaf Truck - Replacement — Not Started
- Leaf Truck - Replacement — Not Started
- Grapple Truck - Addition — Not Started
- Right of Way Mowing Tractor - Replacement — Not Started
- Tandem Semi Tractor w/ Wet Line - Addition — Not Started
- Dump Truck - Replacement — Planning
- Automated Side Loader — Not Started
- Roll Out Carts — Not Started
- Backhoe - Replacement — Not Started
- Leaf Truck - Replacement — Not Started
- Automated Side Loader - Addition — Not Started
- Chipper Truck - Replacement — Not Started
- Leaf Truck - Addition — Not Started
Stormwater Utility (8)
- Lake Pine Dam Rehabilitation/Replacement — Not Started
- Street Sweeper - Replacement — Not Started
- Capitata Crossing Stream Stabilization — Not Started
- Culvert Street Drainage and Watershed Repairs — Not Started
- Seagroves Dam Repairs — Not Started
- Jordan Lake Nutrient Management Strategy Rules Retrofits Fund — Not Started
- Scotts Mill Drainage Repairs — Not Started
- Walden Woods Stream Restoration — Not Started
Transportation (31)
- Old US 1 at Friendship Road Improvements Cost Share — Acquisition
- Justice Heights Street Extension — Design
- Apex Peakway Southwest Connector — Construction
- Annual GoApex Transit Improvements — Ongoing
- Annual Pavement Management — Ongoing
- Apex Peakway North Widening — Planning
- GPS Emergency Vehicle Preemption — Planning
- Olive Chapel Road at Apex Barbecue Road Improvements — Planning
- South Salem Street Bicycle Connection — Planning
- West Williams Street Sidewalk & Vision Zero Upgrades — Planning
- Apex Peakway Southwest Widening — Not Started
- Center Street Railroad Crossing Improvements — Not Started
- Chatham Street Railroad Crossing Improvements — Not Started
- Jessie Drive Phase 1 — Design
- S-line Mobility Hub — Planning
- Safe Routes to School — Planning
- Wayfinding Signage Fabrication & Installation — Planning
- Chatham Street Sidewalk Phase 2 — Not Started
- Davis Drive at Salem Church Road Realignment — Not Started
- Jessie Drive Phase 2 — Not Started
- Tingen Road Pedestrian Bridge — Design
- Traffic Signal System: Apex-Holly Springs-Fuquay-Varina Partnership — Not Started
- US 64 at NC 751 Interchange Enhancements Cost Share (R-5887) — Not Started
- NC 55 Sidewalk & Enhancement Cost Share (U-2901B) — Planning
- US 64 Sidewalk & Enhancement Cost Share (U-5301) — Planning
- Apex Peakway Southeast Connector — Planning
- Apex Peakway at Tingen Rd Intersection Improvements — Not Started
- GoApex New Bus Stop Installations — Not Started
- Richardson Road at Core Banks Street Traffic Signal — Not Started
- US 1 at ten Ten Road Enhancement Cost Share (U-5825B) — Not Started
- Wimberly Road Sidewalk — Not Started
Water & Sewer Utility (31)
- Abbington Gravity Sewer Extension — Planning
- Apex Elementary Gravity Sewer Extension — Planning
- Little Beaver Creek Outfall Extension — Planning
- UV System Replacement — Planning
- BP5.C001: NCDOT Olive Chapel Road Culvert Replacement — Planning
- Elevated Water Storage Tank #5 — Planning
- HL-0007: NC 55 Intersection Improvements Utility Relocation — Planning
- SCADA System Upgrades — Planning
- US 64 & New Hill Olive Chapel Water Line Loop — Planning
- Waterline Gaps (Green Level West) — Planning
- Waterline Gaps (New Hill) — Planning
- Old Raleigh Road Water Line Replacement — Not Started
- Waterline Gaps (Humie Olive) — Not Started
- Waterline Gaps (US 64/Salem) — Not Started
- Waterline Gaps (Zeno Road) — Not Started
- Waterline Gaps (NC-540) — Not Started
- Knollwood Drive Waterline Replacement — Not Started
- U-5301: US 64 Corridor Improvements Utility Relocation — Not Started
- Waterline Gaps (Castleberry) — Not Started
- Waterline Gaps (Central Apex) — Not Started
- U-2901B: NC 55 North Widening Utility Relocation — Not Started
- U-5825: Ten-Ten Road Widening Utility Relocation — Not Started
- Cary Subtotal - WWRWRF — Ongoing
- Cary Subtotal - CAWTF — Ongoing
- Cary Subtotal - Beaver Creek PS — Planning
- CCTV Equipment/Van Replace — Not Started
- Waterline Gaps (Beaver Creek Commons) — Not Started
- Apex Plant Trunk Line Replacement — Not Started
- Feltonsville Gravity Sewer Extension — Not Started
- Waterline Gap Green Level Church — Not Started
- Waterline Gaps (Feltons Grove) — Not Started